windenergydirect

About windenergydirect

This author has not yet filled in any details.
So far windenergydirect has created 50 blog entries.

2.35 MW Auto-Production Wind Turbine for Grady Joinery.

A €4 million wind turbine has been installed by Wind Energy Direct at Grady Joinery, Charlestown, Co. Mayo. This 2.35 MW wind turbine will generate circa 6.2GWh per annum and provide Grady Joinery with over 60% of their total energy requirements. The wind turbine will generate enough energy to power the equivalent of 1,476 houses [...]

By | February 27th, 2017|News, Projects, Wind Energy|

500kW Turbine Commissioned at Lawrence Landfill

  Wind Energy Direct developed, installed and commissioned a 500kW wind turbine at Lawrence Landfill, Havefordwest, South Wales. The wind turbine went live March 18th 2016 and was supplied by Enercon, E53 model derated to 500kW.

By | February 27th, 2017|News, Projects, Wind Energy|